Service

Survey and Route Assessment

Route, OPGW, ADSS and walk-over surveys that establish what a line project will actually encounter on the ground.

Surveyor in a hard hat and high-visibility vest setting up an instrument beneath a double-circuit transmission line

A good survey reduces surprises during construction. Route surveys establish line length, tower locations and angle points, and record the crossings, terrain and access constraints a project team must plan for.

What the service includes

Survey types

  • Normal and interconnected route survey
  • OPGW survey
  • ADSS survey
  • Overhead electrical (OHE) line survey
  • Walk-over survey
  • Telecom site survey

What a route survey records

  • Route length and number of tower locations
  • Deviations and tower-angle cut points
  • River crossings and forest areas
  • Rocky or waterlogged terrain
  • Right-of-way constraints
  • Site accessibility for construction planning

Execution scope

  • New transmission routes and line diversions
  • OPGW and ADSS retrofit planning
  • Telecom site assessments

Terminology

Walk-over survey
A preliminary on-foot assessment of a proposed route before detailed survey.
Right of way (RoW)
The corridor of land a line needs, and the permissions to use it.
OHE
Overhead equipment — commonly the overhead line system on electrified railways.

Project references

Project references

Individual project records for this service are not yet published on the website. References can be provided on request — contact the project team.

Project enquiries

Discuss your next transmission or substation project.

Share the scope, voltage level and location. The project team will respond to business enquiries through the contact details you provide.

Office
Vadodara, Gujarat